Projects

Projects completed by SEE

Kings Cross S4

Projects

Kings Cross S4

Kings Cross S4

Following our first contract award from Laing O’Rourke, SEE are delighted to be appointed by Laing O’Rourke again on the neighbouring S4 development which is part of the Kings Cross Estate.

The building is a mixed tenure residential building up to 14 storeys with a basement, and there will be 176 new homes delivered as part of the scheme.

SEE is to supply and install the complete electrical shell and core fitout and apartment electrical fitout to all 176 high end apartments.

Laing O Rourke

Project Gallery

Kings Cross S4 Read More »

Ebury Bridge Estate

Ebury Bridge Estate

Ebury Bridge Estate

South East Engineering Installations Ltd (SEE) are delighted to be re- appointed by HE Simm on the first phase of the multi phase Ebury Bridge Estate project.

SEE’s remit on the project is to deliver a full electrical shell and core fitout alongside the electrical fit out of 226 apartments over two blocks.

Located in the heart of central London, the proposals will see the full redevelopment of the current estate and the creation of high-quality, sustainable homes.

SEE have a clear objective to deliver high quality workmanship on every project which has led to this being the fourth successive long term project secured with HE Simm..

logo_he-simm

Project Gallery

Ebury Bridge Estate Read More »

Elephant and Castle

Elephant & Castle

Elephant & Castle

South East Engineering Installations Ltd, are delighted to announce it has been appointed by premier construction company Multiplex, to provide Mechanical and Electrical Installation services at Elephant and Castle’s New Town Centre Development, which is part of the wider Southwark regeneration programme.

From Stage 4 design through to commissioning, this three-year, contract covers the full fitout of 485 apartments to include all LV ,ELV, Flat Ducts, CWS, HWS and LTHW, Flushing, Testing, Balancing and Commissioning.

Multiplex

Project Gallery

Elephant and Castle Read More »

Travel Hub – Astra Zeneca

Projects

Travel Hub Astra Zeneca

Travel Hub Astra Zeneca

South East Engineering Installations Ltd are appointed for the first time by Phoenix ME for a full electrical fit out of the Travel Hub building for AstraZeneca at the Cambridge Biomedical Campus.

The Travel Hub will provide car parking, cycle storage (including pool cycles) along with showers, changing and drying facilities and a café / workshop and a logistics centre. The building is a key piece of infrastructure in the ongoing development of the site.

SEE’s works consist of the Install of primary containment, LV distribution including DB’s, ATS’s and Submains and small power and lighting installation.

Phoenix-removebg-preview

Travel Hub – Astra Zeneca Read More »

The Silk District Whitechapel

Projects

The Silk District Whitechapel

The Silk District Whitechapel

A re-appointment from HE SIMM to deliver a full electrical shell and core fitout alongside the electrical fit out of 262 apartments over three blocks – ranging from five to 25 storeys.

The Silk District is a new development located moments from Whitechapel Station and within walking distance to the City. The new Crossrail line will mean The Silk District is only 3 minutes to Canary Wharf, 2 minutes to Liverpool street and 10 minutes to Bond street making it perfectly situated for the daily commute.

SEE’s can-do approach and commitment in delivering quality in every project we deliver makes us easy to work with and keeps our clients coming back time and again.

logo_he-simm

The Silk District Whitechapel Read More »

Kings Cross S5

Projects

Kings Cross S5

Kings Cross S5

The pentagonal S5 plot on the northern tip of King’s Cross redevelopment will accommodate 163 homes above a double height arcade. Taking inspiration from St Pancras’s arches and brickwork which echoes the characteristics of the area’s industrial heritage.

SEE’s first instruction from Laing O’Rourke (CHt) is to supply and install the complete electrical shell and core fitout and apartment electrical fitout to all 163 high end apartments.

An exciting opportunity to work alongside a new client and showcase how we deliver projects safely, efficiently and to the highest standards in the industry.

Laing O Rourke
cht

Kings Cross S5 Read More »

Oval Village

Project

Oval Village

Oval Village

SEE are delighted to again be working in partnership with Vital Energi on their Oval Village project. Oval Village is located in Kennington and will boast an impressive collection of apartments with the charm and character of village life but with the buzz of a city location.

SEE’s remit on the project covers the building’s HV & LV Electrical infrastructure with sub mains distribution to 344 apartments, the marketing suite and Tesco supermarket.

Vital Energi

Project Gallery

Oval Village Read More »

Cherry Park

Projects

Cherry Park

Cherry Park

South East Engineering Installations Ltd are delighted to have been awarded the Electrical package consisting of the apartment fit out of 527 apartments on the very impressive Cherry Park project, working on behalf of Westfield Europe Limited.

The project involves the redevelopment of a vacant site located south of the existing Westfield Stratford City Shopping Centre, into a new residential led mixed use development alongside a series of new public spaces. Development will feature approximately 1,200 new homes benefitting from a suite of amenities including a residents' gym, swimming pool, workspace and high-quality public areas.

A very exciting project for SEE starting in early 2021.

LOGO

Cherry Park Read More »

Finsbury Tower

Projects

Finsbury Tower

Finsbury Tower

South East Engineering Installations Ltd are delighted to be appointed again by MACE MEP on our biggest project to date, Finsbury Tower in Islington. This project will see an extra 12 floors added to an existing 1960s built office to transform the existing 153,000 sq ft office building to over 310,000 sq ft of retail, residential and office space across 29 storeys.

We are proud to be continuing our ongoing relationship with MACE MEP and completing another exciting project in the city which will consist of HV and LV mains distribution, a full shell and core electrical installation and a Cat A fit out to the 28 storey office premises.

MACE 1

Finsbury Tower Read More »

The Stage

Projects

The Stage

The Stage

The Stage is a new construction development on the site of Shakespeare’s former Curtain Theatre in Shoreditch. The project will have 275,000 sq. ft of office space and 413 apartments. A heritage centre on the site will showcase the remains of the Shakespeare’s Curtain Theatre, where Romeo & Juliet and Henry V were first preformed. This will include a 200-seat sunken amphitheatre, a venue for future plays to be performed.

South East Engineering Installations Ltd are honoured to participate in the redevelopment of this historic site with instructions to complete the shell and core electrical installation and complete apartment fit out to 413 high end luxury apartments.

Cilantro

Project Gallery

The Stage Read More »